[{"data":1,"prerenderedAt":181},["ShallowReactive",2],{"guide:en:resource-management":3},{"id":4,"title":5,"body":6,"description":173,"extension":174,"meta":175,"navigation":176,"path":177,"seo":178,"stem":179,"__hash__":180},"guide_en/en/user/resource-management/index.md","Resource Management — Materials, Labour, and Equipment",{"type":7,"value":8,"toc":166},"minimark",[9,14,18,47,50,55,120,124,127,147,151,158],[10,11,13],"h1",{"id":12},"resource-management","Resource Management",[15,16,17],"p",{},"Resources are the building blocks of work in Aptli: the materials, labour types, and equipment that get planned into tasks, allocated in work orders, tracked in inventory, and consumed on field reports. This broad definition encompasses:",[19,20,21,29,35,41],"ul",{},[22,23,24,28],"li",{},[25,26,27],"strong",{},"Planned labour"," — e.g. installation of field equipment",[22,30,31,34],{},[25,32,33],{},"Ad hoc tasks"," — e.g. draining a flooded access point",[22,36,37,40],{},[25,38,39],{},"Consumable stock"," — e.g. metres of cable or countable items",[22,42,43,46],{},[25,44,45],{},"Non-consumable equipment"," — e.g. ladders and forklifts",[15,48,49],{},"Resources need to be registered before they can be allocated to work orders, tasks, or inventory transactions. While it is not critical to capture every possible item, having the most common needs defined outside of a catch-all \"miscellaneous\" category makes reporting and planning significantly more useful.",[51,52,54],"h2",{"id":53},"where-to-manage-resources","Where to Manage Resources",[56,57,58,71],"table",{},[59,60,61],"thead",{},[62,63,64,68],"tr",{},[65,66,67],"th",{},"Task",[65,69,70],{},"Location",[72,73,74,87,98,109],"tbody",{},[62,75,76,80],{},[77,78,79],"td",{},"Create and edit resource definitions",[77,81,82],{},[83,84,86],"a",{"href":85},"/guide/inventory-management/resources","Inventory → Resources",[62,88,89,92],{},[77,90,91],{},"Track stock levels and movements",[77,93,94],{},[83,95,97],{"href":96},"/guide/inventory-management/transactions","Inventory → Transactions",[62,99,100,103],{},[77,101,102],{},"View stock at a specific site",[77,104,105],{},[83,106,108],{"href":107},"/guide/inventory-management/sites","Inventory → Sites",[62,110,111,114],{},[77,112,113],{},"Generate QR codes for physical reference books",[77,115,116],{},[83,117,119],{"href":118},"/guide/admin","Admin → Resource QR Codes",[51,121,123],{"id":122},"resource-types","Resource Types",[15,125,126],{},"Aptli recognises three resource types, which affect how a resource is tracked and converted:",[19,128,129,135,141],{},[22,130,131,134],{},[25,132,133],{},"Material"," — consumable items tracked by quantity and unit of measure (e.g. Cat6 cable in metres, conduit fittings by count)",[22,136,137,140],{},[25,138,139],{},"Labour"," — people or teams required for a task, tracked by hours or days",[22,142,143,146],{},[25,144,145],{},"Equipment"," — non-consumable items that are allocated and returned (e.g. ladders, vehicles, test equipment)",[51,148,150],{"id":149},"getting-started","Getting Started",[15,152,153,154,157],{},"If you are setting up resources for the first time, see the ",[83,155,156],{"href":85},"Inventory Management — Resources"," guide for step-by-step instructions on creating your resource catalogue.",[15,159,160,161,165],{},"For authentication and user management topics (session settings, force logout, login troubleshooting), see ",[83,162,164],{"href":163},"/guide/admin/authentication","Admin — Authentication",".",{"title":167,"searchDepth":168,"depth":168,"links":169},"",2,[170,171,172],{"id":53,"depth":168,"text":54},{"id":122,"depth":168,"text":123},{"id":149,"depth":168,"text":150},"Resources are the catalogue of materials, labour, and equipment that flow through tasks, work orders, inventory, and field reports. This page explains what resources are and where to manage them.","md",{},true,"/en/user/resource-management",{"title":5,"description":173},"en/user/resource-management/index","iY9MCY4GdWVxJUw6DNZgni96WF7nFVzyCZFTjprHtj4",1776295546620]